Improving open pit mine economics through ultimate pit slope optimization: case study of Pickstone-Peerless mine

dc.contributor.authorNyamande, Pardon
dc.date.accessioned2024-01-12T08:02:04Z
dc.date.available2024-01-12T08:02:04Z
dc.date.issued2024
dc.descriptionA research report submitted in partial fulfilment of the requirements for the degree of Master of Science in Engineering to the Faculty of Engineering and the Built Environment, University of the Witwatersrand, Johannesburg, 2021
dc.description.abstractIn most open pit mining operations the need to create stable pit slopes and the influence of the overall pit slope on the economics of such an operation is highly appreciated. Despite such knowledge many open pit mines are designed with little or no geotechnical investigations being carried out so as to come up with an optimized pit slope in line with site specific conditions. This can lead to under or over estimating pit slope angles. Conservative (too gentle) slopes result in high stripping ratios therefore a high operating cost. Slopes too steep may result in slope failures, which may lead to high operating costs or premature mine closure. This project emphasises the importance of geotechnical investigations not only for safety reasons but for economic reasons as well. A case study of Pickstone Peerless mine was used. Geotechnical data was gathered through core logging and face mapping of the existing pit. The data gathered was then used for stability analysis employing empirical, kinematics, limit equilibrium and numerical modelling. Rocscience software packages were used for numerical based analysis. From the results obtained it was concluded that it is possible to steepen the current 52o overall pit slope angle of the Peerless pit by 1o without compromising stability at both bench and regional scales. This will be possible provided adequate slope management practices are put in place and adhered to. The steeper slope would have saved the mine more than 2,681,110 m3 of waste stripping, translating to in excess of $12,064,995.00 (USD) in financial savings for the existing pit. The steeper angle applicable to the current pit may not be appropriate to the pit extensions. Further geotechnical evaluations should be done on suitably positioned and spaced boreholes in the area of the extension, to verify the stability of steeper slopes in that area. The analysis done as part of this project was used to show that the current pit can be deepened by 5 m without a push back.
dc.description.librarianTL (2024)
dc.facultyFaculty of Engineering and the Built Environment
dc.identifier.urihttps://hdl.handle.net/10539/37314
dc.language.isoen
dc.schoolSchool of Mining Engineering
dc.subjectOpen pit mining
dc.subjectMining
dc.subjectPit slope
dc.titleImproving open pit mine economics through ultimate pit slope optimization: case study of Pickstone-Peerless mine
dc.typeDissertation
Files
Original bundle
Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
Abstract.pdf
Size:
251.81 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
Final research report.pdf
Size:
9.38 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
2.43 KB
Format:
Item-specific license agreed upon to submission
Description: