School of Civil & Environmental Engineering (ETDs)
Permanent URI for this community
Browse
Browsing School of Civil & Environmental Engineering (ETDs) by School "School of Civil and Environmental Engineering"
Now showing 1 - 12 of 12
Results Per Page
Sort Options
Item A Comparative Study of the Efficiencies of Vertical Bracing Practices(University of the Witwatersrand, Johannesburg, 2023-11) Saunders, Shawn Wayne Valintino; Elvin, AlexThe efficiencies of cross sections and configurations applied to vertical bracing are investigated by evaluating reference configurations (RCs), composed of cross braced circular hollow section (CHS) members, against comparative configurations (CCs), consisting of cross-braced Angle members, and single-CHS members. The metrics used to evaluate efficiencies were mass, raw materials costs, and fabrication and erection costs. CCs were found to be more efficient than RCs for most analysed cases, metric and configuration dependent. The following results were found: i. Mass metric a. Crossed-Angle more efficient in 79% of analysed cases. b. Single CHS more efficient in 87% of analysed cases. ii. Raw materials costs metric a. Crossed-Angle more efficient in 92% of analysed cases b. Single CHS more efficient in 88% of analysed cases iii. Fabrication and erection costs metric a. Crossed-Angle more efficient in 90.4% of analysed cases b. Single CHS more efficient in 88.5% of analysed cases Inversions of the efficiency parameter findings, with RCs more efficient than CCs, were observed when: i. RC CHS member slenderness ratios were less than 80-90. ii. CC design loads were greater than 225 kN, 1200 kN and 1500 kN for mass, raw materials and total cost efficiency metrics, respectivelyItem Addressing high dimensionality in water quality modelling in water distribution networks(University of the Witwatersrand, Johannesburg, 2024-02) Machweu, Morongwa Ednah; Taigbenu, AkpofureWater quality models are the most effective tools for characterizing water quality conditions, assessing the effects of water pollution, and supporting decision-makers with water quality management. They can be utilised for detecting the variations in the water quality parameters. Despite the usefulness of water quality models, an appropriate and simple water quality descriptor for a particular application, considering the high dimensionality of various water quality parameters, remains a challenge (Chapman, 1992). To address this high dimensionality, a single dimensionless index is commonly used to describe water quality for a particular application. While pollution loads at various points in a river reach have been widely assessed by studies using water quality indices, little research has been done on water distribution networks with service reservoirs and a variation of loading conditions. In a water distribution network, service reservoirs function similarly to rivers in that they have complicated mixing mechanisms, are subject to a variety of water quality factors, and are sized and located differently. The most common water quality indices require the formation of subindices and weights to avoid ambiguity, eclipsing and rigidity. The Canadian Council of Ministers of the Environment Water Quality Index (CCME WQI) does not require the formation of sub-indices and weights, thus providing a simplified way of describing water quality. This study investigates the use of the CCME WQI to address high dimensionality in water quality modelling of water distribution networks, taking into consideration the locations of multiple service reservoirs. This study was carried out primarily for decision-making and design optimization purposes only. Using EPANET 2.2, four hydraulically optimised solutions (which satisfied minimum pressure requirements) were further analysed for water quality performance. This was achieved by incorporating simulated data on three water quality variables (chlorine residual, water age and THM concentration) into the CCME WQI for a hypothetical water distribution network, Anytown. The results indicate that two of the four hydraulically optimised solutions achieved excellent water quality levels. This study has demonstrated the usefulness of a dimensionless index as a proxy for multiple water quality variables of a water distribution system in facilitating decision-making.Item Comparative study of five country-specific labour-intensive infrastructure development programmes : implications for South Africa(University of the Witwatersrand, Johannesburg, 2010) Quainoo, Harry Akyen; McCutcheon, R.T.Unemployment and abject poverty in South Africa are widespread, persistent and disproportionately high. These problems are aggravated by inadequate capacity at all tiers of government and huge infrastructure backlogs in rural South Africa. Employment-intensive means of infrastructure delivery have been successfully implemented in several sub-Saharan African countries and elsewhere to generate employment and reduce poverty. It should be possible to replicate similar large-scale national programmes in South Africa. But South Africa has failed. Both prior to and since 1994, several supposedly employment-intensive programmes have been implemented in South Africa with poor results. In an endeavour to contribute to future South African policy and good practices regarding employment, this thesis describes and analyses in detail five major Sub-Saharan programmes and reaches conclusions regarding their achievements and shortcomings. Lessons derived bridge the knowledge gap between the large-scale programmes embarked upon in the sub-Saharan countries in the mid-1980s and the year 2007; these lessons should be applied to future endeavours in South Africa to generate significant employment per unit of expenditure and contribute to poverty alleviation. A major conclusion reached was that the success of employment-intensive infrastructure development programmes depends to a large extent on fundamental factors such as appropriate and implementable policy, government commitment, adequate and sustainable funding, adequate capacity and good preparation. Specifically, the thesis demonstrated that prior to implementation a sufficient timeframe is required for programme preparation in order to make significant contribution towards poverty reduction. Equally, national programme expansion requires a strategic balance between centralisation and decentralisation. In particular, for programme extension and decentralisation, due regard must be given to training and capability building and available resources. Deriving from the thesis’ major conclusions, the author developed three crucially important frameworks for anti-poverty infrastructure development programmes, namely; a four-phased model for evaluating the chances of success of infrastructure programmes, a five-phased result-oriented guidelines for testing the workability of infrastructure development policies, and a practical guideline for monitoring and evaluating employment-creation programmes that maximises the benefits thereof and pre-empts institutional memory loss through systematic knowledge management.Item Developing of a parametrically resonw1t vibrating screen, modelling, simulation and dynamic testing(University of the Witwatersrand, Johannesburg, 2023-07) Mohanlal, Mishal; Li, KuinianA novel coupled spring pendulum vibrating screen is proposed with the goal of developing efficient screening using parametric resonance. A simple spring pendulum is initially studied to provide the basis of the dissertation. The theoretical model of the proposed vibrating screen is developed using Lagrangian mechanics which includes damping and generalized forces. Two derivations of the vibrating screen are proposed, the first being a 4DOF (degree of freedom) system and the second being a 3DOF system. The 3DOF system is found to present better numerical stability and is thus utilized for the study. It is shown that the 3DOF system is comparable to the simple spring pendulum for the case where initial conditions are applied to similar coordinates. The proposed vibrating screen presents motion which is not indicative of traditional vibrating screens. It is found that a system where attributes are sized for parametric resonance requires far smaller excitation forces to achieve higher accelerations and displacements compared to traditional vibrating screens. The proposed vibrating screen is an unfeasible design due to the large displacements; high foundation loads and limitations on mechanical components. Discrete element method (DEM) simulations of the proposed vibrating screen are performed to study the efficiency with varying inclinations of the mesh deck. The results are compared to a linear motion vibrating screen. The proposed screen requires far less energy compared to traditional vibrating screens and achieves higher efficiencies with larger deck inclinations. The derived differential equations are verified by experimental testing using free vibrations. The numerical simulations and experimental tests present a good correlation. Signal processing is implemented to compare the natural frequencies from the experimental testing and numerical simulations, the results present a good correlation.Item Effect of pipeline pigging on raw water pipeline flow rate and energy consumption(University of the Witwatersrand, Johannesburg, 2024-02) Phillip, Neil Claude; Ndiritu, JohnPipeline pigging is a widely used method of pipeline cleaning to improve the hydraulic efficiency of a pipeline system, reduce deposits within a pipeline, reduce operational costs and improve water quality. With insufficient pipe cleaning, pipeline deposits accumulate within the pipeline which reduces the cross-sectional flow area of the pipeline and increases the friction losses in the pipeline. This subsequently reduces the operating flow rate, increases the pumping cost of the system, and reduces the water supply to the surrounding area. Therefore, the study aimed to investigate the hydraulic improvements and operational cost savings of a pipeline system after pigging and to determine when pigging should be done. A case study of the Tayside high lift pump station in South Africa was used for this investigation. Results indicate that pigging removes deposits and sediments from the pipelines thereby increasing the flow rate while reducing the cost of pumping substantially. The increase in flow rate calculated from the case study was 23.9% after one of the pigging operations in 2016. In addition, the pigging operations completed yearly also indicated a flow rate increase after pigging. The study showed that the increase in sediment levels of the raw water in the rainy season led to a reduction in the hydraulic capacity of the pipeline indicating an increase in sediment deposition in the pipeline. Life cycle cost analysis of the case study system obtained annual cost savings of R991,800.59 over a 50-year period. Based on the findings, a flexible routine for pigging based on the reduction in the hydraulic capacity of the pipeline is proposed to cater for the variability in levels of sediment in the raw water in alignment to the rainfall and streamflow patterns. This allows the pipeline to operate at the lowest energy cost and at the highest possible flow rate.Item Groundwater resource exploration within the inner-city of Johannesburg(2020) Tywakadi, Ondela; Taigbenu, Akpofure E.This study examined the hydrogeological characterisation of the Johannesburg inner-city. Residents reported a high water table that has resulted in groundwater seepage into building basements, posing a safety threat and limited functionality of these structures. Although this high groundwater table triggered this investigation, it took a deeper and broader approach by seeking to quantify the amount of groundwater resource that is available to be used to supplement the existing municipal supply. The study also aimed at establishing long-term sustainable abstraction rates and viable fit-for-purpose use of the available groundwater. The study then evaluated the abstraction rates against the water table response in order to achieve a safe water table level at which groundwater seepage into building basements does not occur. The methodology employed included assessing and verifying the number and distribution of buildings affected by groundwater seepage. Information was gathered by circulating a survey in the form of a questionnaire to a network database of property owners and managers. Field work, in the form of drilling and testing boreholes, and subsequent data processing were carried out to characterise the aquifers and establish the quantity of the resource. In order to determine possible uses of the groundwater, water chemistry testing was carried out. The characteristics and recharge dynamics of the aquifers that were established served as inputs into a numerical model which estimated the quantity of groundwater that can be sustainably abstracted for utilisation, while ensuring the water table is sufficiently suppressed. An estimated 2.47 million-m3 (or billion-litres) of groundwater is available as a total yield potential within the Johannesburg inner-city. This water can be sustainably withdrawn from the ground at a safe yield (abstraction rate) of over 56 million-litres per annum (56 902m3/a) from the nine drilled boreholes. The system response corresponding to this abstraction rate is predicted to cause a 2.3m decline in the water table level compared to the current scenario. This desired pumping scenario would suppress the water table level to be at an average of 8.6m below ground. The average basement depth in the Johannesburg inner-city is 8m below ground and hence, most building basements would consequently not be flooded under this scenario. Currently, 60% of building basements are subjected to the risk of flooding, and this would reduce to 30%, which is made up of those deeper than 9m. The current water demand in the Johannesburg inner-city is approximated to be 80Ml/day. Therefore, the estimated groundwater yield to supplement the municipal supply is insignificant (0.2%), and does not justify an investment into retrofitting the groundwater infrastructure into the bulk infrastructure system. Thus, developing a groundwater source infrastructure for bulk water supply purposes is not volumetrically viable in the case of Johannesburg inner-city, but can be beneficial for building strategic reserves and resilience into the system. It is recommended that in future, fine-tuning and continuous calibration of the numerical model should be carried out when the boreholes are in operation. Further research is also required to examine the aquifer geo-mechanics in order to assess the risk of land subsidence with decreasing water table levels, especially in a possible future scenario of over-exploitation of the aquifer.Item Hydraulic Performance Assessment and Upgrading of The Tswelopele Village (Gauteng) Water Distribution Network(University of the Witwatersrand, Johannesburg, 2024-02) Magabatela, Jonathan; Ilemobade, AdesolaThe hydraulic performance assessment of a water distribution network can reveal critical information that might help to address challenges experienced within that network. This study investigated the hydraulic performance and upgrading of the Tswelopele water distribution network to accommodate additional 35 yard connections. In line with the main objective of the study, the following were addressed, (1) modelling and simulating in EPANET the existing Tswelopele water distribution network and ascertaining the nodes experiencing below minimum pressures, (2) determining and incorporating upgrades required to accommodate current and future water demands, (3) optimization of the proposed upgraded water distribution network, initially using trial and error typically employed by industry and then using Wadiso software and (4) comparison of results obtained using the two approaches. Tswelopele Village comprises 89 households, and only 54 are connected to the existing water distribution network. The existing water distribution network was refurbished in 2015 but some households which are part of the water distribution network are still experiencing erratic water supply. A model of the existing network was prepared and simulated in EPANET. The analysis results indicated that only one node had a pressure value below the normally minimum accepted of 20m, but it was more than the minimum allowable pressure of 15m. Therefore, it is suspected that the water challenges might not be due to low pressure but to other reasons such as leakages, partially open valves or illegal connections. To accommodate the additional 35 households, an upgrade of the network incorporating future water demands was proposed. Optimization by trial and error was employed as per usual industry approach and was checked by optimization with Wadiso software. A comparison of the results revealed that based on July 2023 pipe cost estimates a 19.5% saving could be realised by using Wadiso optimization software as compared to the traditional trial and error.Item Improving the Penalty-Free Multi-Objective Evolutionary Design Optimization of Water Distribution Systems(University of the Witwatersrand, Johannesburg, 2024-02) Kambalame, Emily; Ndiritu, JohnWater distribution networks necessitate many investments for construction, prompting researchers to seek cost reduction and efficient design solutions. Optimization techniques are employed in this regard to address these challenges. In this context, the penalty-free multi-objective evolutionary algorithm (PFMOEA) coupled with pressure-dependent analysis (PDA) was utilized to develop a multi-objective evolutionary search for the optimization of water distribution systems (WDSs). The aim of this research was to find out if the computational efficiency of the PFMOEA for WDS optimization could be enhanced. This was done by applying real coding representation and retaining different percentages of feasible and infeasible solutions close to the Pareto front in the elitism step of the optimization. Two benchmark network problems, namely the Two-looped and Hanoi networks, were utilized in the study. A comparative analysis was then conducted to assess the performance of the real-coded PFMOEA in relation to other approaches described in the literature. The algorithm demonstrated competitive performance for the two benchmark networks by implementing real coding. The real-coded PFMOEA achieved the novel best-known solutions ($419,000 and $6.081 million) and a zero-pressure deficit for the two networks, requiring fewer function evaluations than the binary-coded PFMOEA. In previous PFMOEA studies, elitism applied a default retention of 30% of the least cost-feasible solutions while excluding all infeasible solutions. It was found in this study that by replacing 10% and 15% of the feasible solutions with infeasible ones that are close to the Pareto front with minimal pressure deficit violations, the computational efficiency of the PFMOEA was significantly enhanced. The configuration of 15% feasible and 15% infeasible solutions out performed other retention allocations by identifying the optimal solution with the fewest function evaluations.Item Passive Vibration Isolation Systems Integrated with Dynamic Vibration Absorber(University of the Witwatersrand, Johannesburg, 2023-02) Thakadu, Katlego; Li, KuinianIsolating vibration using an isolator and/or vibration absorber are the two commonly used measures of vibration control in practice. The presented investigation explores multiple passive vibration isolator configurations, integrated with a dynamic vibration absorber, to improve the performance of vibration isolating. In the first section, A Passive vibration Isolator Integrated with a Skyhook and Groundhook Vibrational Absorber is investigated. The dynamic behaviour of the proposed isolators with the lumped mass, fixed to an inertial reference, is investigated using force, and displacement transmissibility equations. The force and displacement transmissibility equations are derived by modelling the dynamic system as a two-degree-of-freedom system. Derivations for both configurations of the isolator, integrated with a skyhook and groundhook are presented, including numerical simulations and parameter sensitivity analyses. The analysis conducted, indicates that both configurations, is indeed a passive linear isolator, which can support a static load whilst achieving significant vibrational isolation, employing a relatively low damping element. Additionally, the practical applications of the proposed configurations are plausible with the currently available material, which makes the research viable within the field of engineering. In the second section, A Passive vibration Isolator Integrated a Dynamic Vibration Absorber with Negative Stiffness Spring is investigated. The dynamic behaviour of the isolator supporting a lumped mass, is investigated using force and displacement transmissibility equations of the isolator. The force and displacement transmissibility are derived by modelling the dynamic system as a two-degree-of-freedom system. A unique constraint on the negative stiffness ratio, α, for the isolator’s stable operation, is developed. The optimal design of such an isolator was demonstrated with a design example. Extensive numerical simulation and parameter studies on the isolator were performed, which revealed attractive dynamic characteristics of the isolator. It is a passive linear isolator, without any non-linear elements, spring or damper. However, it can bear a large static load and, at the same time, achieve a greatly increased vibration isolation. These two effects are considered mutually exclusive in linear isolator and can be overcome in some extent by properly configured nonlinear isolators only. Moreover, numerical simulation and parameters study shows that the negative stiffness ratio and the mass ratio required can be very small, which makes the implementation of such an isolator in practice convenient. All these make the isolator attractive for engineering application. The third section of this research is on the optimal design of a two-stage isolator, a isolator integrated with another isolator. Performance of a passive two-stage vibration isolator and its design was rigorously evaluated and recorded in this study. It is revealed that the vibration isolating performance of a linear passive two-stage vibration isolator depends on the configurational parameters of the isolator. The transmissibility, a non-dimensional parameter used to quantify the effectiveness of an isolation system, of the passive two-stage vibration isolator was derived. A numerical optimization on the transmissibility of the isolator was developed and performed using the Minimax algorithm. It is demonstrated that an optimally designed linear passive two-stage vibration isolator produces significantly better isolating than a single-stage linear isolator at all frequencies, high and low. The proposed linear passive two-stage isolator is not only effective against high-frequency isolation, which used to be the primary use of a passive two-stage isolator but shows outstanding isolation performance at all frequencies. The proposed linear passive two-stage vibration isolator outperforms many complicated nonlinear isolators, including both single-stage or two-stage isolators. Parameter selection, dynamic performance driven optimal design and potential application of the proposed isolator were also investigated and presented.Item The theory and practice of community participation in provision of urban structure(University of the Witwatersrand, Johannesburg, 1993) Abbott, John; McCutcheon, RobertThe thesis develops a new approach to community participation, for application to infrastructure provision projects in developing countries, based upon social surveys and case studies of negotiations in five South African communities. Existing approaches to community participation are analysed and shown to be unsuitable for infrastructure provision. The thesis compares the characteristics of infrastructure projects with those of other types of development projects and demonstrates how these characteristics can be used to situate a given project within a project environment defined in terms of two variables: the openness of government to community involvement in decision-making, and project complexity. Social surveys carried out in Soweto and KwaThandeka showed the centrality of infrastructure to social change in South Africa. Existing urban management systems were unable to cope with the stresses placed upon them. Four facets of urban management were identified as being under stress: institutional capacity, legitimacy, affordability, and user convenience. These stresses change the nature of infrastructure provision from the supply of end products into a complex process. Central to this process are: an increased number of actors influencing decisions, the enhanced role of technical professionals, and the social implications of different levels of service. The case-study of KwaThandeka included a study of the negotiation process with the provincial administration. This research led to the development of a performance specification for comparing social, economic and technical measures of value. A new conceptual framework for community participation was derived, based upon the different actors involved in the decision-making process and the different needs of each of those actors. Three case studies from Natal identified different implementation strategies for community participation. Communities were found to have three distinct needs: involvement in the political process; involvement in technical decision-making; and representation as consumers of services. An analytical tool was developed to assist project managers in understanding the relationships between actors in a project. The thesis shows how technical project management can be integrated into the participation process. The success of community participation can be evaluated by assessing the degree of consensus achieved between actors, and the intensity of community involvement.Item Use of Multispectral Satellite Imagery to Monitor the Decant Pond of Tailings Dams(University of the Witwatersrand, Johannesburg, 2023-08) O’Donovan, Christopher Galen; Adam, Elhadi; Torres-Cruz, AlbertoTailings dam failures, such as the Jagersfontein failure in the Free State province and the Fundão and Feijão failures in Brazil, have brought into question the ability of the mining industry to operate safely, threatening its social license. To improve the safety of tailings dams, leading indicators of dam safety should be monitored. The location and historical behaviour of the tailings decant pond provides insight into several such leading indicators and can be used as a proxy to flag potential construction issues. This work investigates the use of public multispectral data collected by the Sentinel-2 satellite mission to monitor the supernatant tailings dam decant pond. This is achieved by leveraging the cloud-based Google Earth Engine platform and open-source GIS tools. Sentinel-2 acquires visible and near infrared spectrum data with a spatial resolution of 10 m and a revisit time of 5 days. Pond data is obtained by visual assessment and automated thresholding of Sentinel-2 imagery. Thresholds of near-infrared (NIR) reflectance and the normalised difference water index (NDWI) obtained by a least square error analysis are investigated. Implementation of the method at three South African tailings dams, constituting four decant ponds, illustrates the capabilities and limitations of Sentinel-2 imagery. High spatial resolution (<5 m) multispectral satellite imagery and natural colour aerial orthophotos (<0.25 m) serve as reference data. Visually assessed Sentinel-2 pond data presented a bias towards slight over estimation of the pond area compared to reference data. Other leading indicators did not show systematic bias across all sites. In general, the deviation between Sentinel-2 and the reference measurements was high, indicating that Sentinel-2 imagery should be used with caution for measurements critical to dam safety. Site-specific thresholds of NIR and NDWI indicated that automated thresholding of the NDWI is superior to NIR reflectance alone. It is shown that Sentinel-2 timeseries imagery can be used in tailings dam monitoring to supplement existing construction surveillance frameworks and provide historical pond data in the absence of such information.Item Water for Firefighting in Sol Plaatje Municipality, Northern Cape, South Africa(University of the Witwatersrand, Johannesburg, 2023) Thage, Tumelo MacAurthur; Ilemobade, AdesolaIn South Africa, SANS 10090 (SABS, 2018a) and the Red Book (DHS & CSIR, 2019) recommend that for firefighting municipal water distribution systems must have and maintain the capacity to provide water for firefighting purposes. van Zyl & Haarhoff (2007) state that the provision of water for firefighting is a dominant design consideration as it influences the sizing and outputs of critical components. Scheepers (2012) argues that fire flows acts ‘as the most limiting demand condition’ as when it required it is extracted in large quantities for a short period. The most commonly used fire flow values in the SANS 10090 have largely remained unchanged for several decades. In other words, these values have not been revised to take account of the evolution of municipal water consumption over more than 30 years. This suggests that the recommended water requirements for firefighting may no longer be fit for purpose. The literature review revealed that the fire flows in the Red book violates the same in the SANS 10090 - this is illegal as the SANS 10090 specifies enforceable absolute limits. Furthermore, the Red book and SANS 10090 provide different fire risk classifications and values for the different parameters and as such, inconsistent and lack uniformity. It is important for design engineers to have accurate input data when planning and designing for fire flow requirements as any deficiency in basic design information could lead to an insufficient capacity to fight fires or an over-design of water supply infrastructure. A question arose from these observations, which provided inspiration for this study: Are fire flows in the SANS 10090 and Red book appropriate for current firefighting efforts? In answering this question, the first step of this study was to identify participating municipalities that were willing to release their datasets on firefighting for this study. Sol Plaatje municipality was one of the willing municipalities. This study thereafter categorised and analysed information contained in the 3236 fire incident reports that occurred within Sol Plaatje Municipality during the period 21 July 2017 to 21 August 2020, and compared actual fire flow volumes and flow rate data against the SANS 10090, Red book and previous South African studies. In order to provide context and aid better understanding of the datasets, structured interviews were conducted with municipal officials responsible for firefighting operations at Sol Plaatje municipality. Key highlights of this study indicated: ∼ 93.3% of fires in Sol Plaatje municipality were extinguished using 7 Kℓ or less of water. This result is similar to previous studies- In a 2014 study more than 90% of fires in 5 Western Cape Towns were extinguished using less than 10 Kℓ of water; In a 2019 study, 75% of fires in the City of Johannesburg were extinguished using less than 6.60 Kℓ of water; and In a 2022 study, 87% of fires in the City of Johannesburg were extinguished using 10 Kℓ or less of water. Overall, 75%-93% of fires were extinguished in the various study areas using 10 Kℓ or less of water. For large fires in Sol Plaatje municipality, the average water volume used to extinguish 85 large Category 2 fires was 8.56 Kℓ or less of water. This finding is similar to that of the Western Cape 2014 study and the 2022 City of Johannesburg study that found that 8.6 Kℓ and 9.63 Kℓ or less of water extinguished 77 and 89 large category 2 fires, respectively. What is evident from the results is that the volumes of water used in Sol Plaatje and previous studies are significantly less that the specified values in SANS 10090 and the Red book. An adverse consequence of higher values is that it leads to an over-design of water supply infrastructure as it increases the volume of municipal storage required for firefighting and consequently, increases the total capacity of municipal storage. Increased storage capacity increases resources that are expended, as well as water retention times, which negatively affects water quality. This study validates the recommendations of previous studies that the fire flows in the SANS 10090 and Red book need to be revised to enable the efficient conservation of scarce water resources and optimal design of water systems.