Waste control in construction projects within the Gauteng Province

dc.contributor.authorRambuwani, Phuluphedziso
dc.date.accessioned2022-06-17T07:14:10Z
dc.date.available2022-06-17T07:14:10Z
dc.date.issued2021
dc.descriptionA research report submitted to the School of Civil and Environmental Engineering, Faculty of Engineering and the Built Environment, University of the Witwatersrand, in partial fulfilment of the requirements for the degree of Master of Science, 2021en_ZA
dc.description.abstractThe motivation of the study is to determine how construction managers control waste onsite in Gauteng province. The aim of the study is to establish a better understanding of how to reduce or eliminate construction waste from building construction projects through the application of lean techniques. The objectives are to identify the causes of construction waste, to determine sustainable methods used during the construction process, to allow construction management to play a part in reducing waste generation, to identify the main types and volumes of construction material waste, and to review this from a lean perspective. The study uses an inductive approach through structured interviews of ten construction managers as a means of data collection. Data analysis is executed by using Microsoft Excel coding to arrange the data into themes and then saved to Microsoft Word. The findings of the study show that concrete and bricks are the most common material waste generated on site. Material handling, design change, poor supervision, poor management, and inadequate planning are the main causes of physical waste. Adequate material handling, effective management, adequate planning and proper supervision, reuse and recycle of waste are the main methods used to reduce waste. The most common types of lean waste are overproduction and defects. Lean tools most often used are just-in-time and value stream mapping. The challenges faced when implementing lean thinking are cultural diversity and lack of lean awareness. The findings show that few construction companies are implementing a lean approach to waste reduction or elimination on sites .It is therefore recommended that construction managers should be educated about implementing lean principles for waste reductionen_ZA
dc.description.librarianCK2022en_ZA
dc.facultyFaculty of Engineering and the Built Environmenten_ZA
dc.identifier.urihttps://hdl.handle.net/10539/32994
dc.language.isoenen_ZA
dc.schoolSchool of Civil and Environmental Engineeringen_ZA
dc.titleWaste control in construction projects within the Gauteng Provinceen_ZA
dc.typeThesisen_ZA

Files

Original bundle

Now showing 1 - 2 of 2
No Thumbnail Available
Name:
715099_PHULUPHEDZISO RAMBUWANI_FINAL RESEARCH REPORT SUBMISSION_AUGUST 2021.pdf
Size:
1.69 MB
Format:
Adobe Portable Document Format
Description:
No Thumbnail Available
Name:
715099 Phuluphedziso Rambuwani _ Cover Page and Abstract.pdf
Size:
65.22 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections