Critical factors in effective construction waste minimisation at the design stage: a Gauteng region case study

dc.contributor.authorWortmann, Anine Eschberger
dc.date.accessioned2015-04-28T10:40:46Z
dc.date.available2015-04-28T10:40:46Z
dc.date.issued2015-04-28
dc.descriptionA research report submited to the Faculty of Engineering and the Built Environment, of the University of the Witwatersrand, Johannesburg, in part all fulfillment of the requirements for the MSc. (Building) in Construction Project Management.
dc.description.abstractConstruction waste minimisation and avoidance at the design stage of a construction project is the most favourable solution in the existing waste management hierarchy triangle. However, there are currently only a limited number of exploratory and context-specific studies that state effective construction waste minimisation factors which can be implemented during the design stage. This can be regarded as a relatively new concept and new research topic, especially as no studies have been done in a South African or a Gauteng region context. This research report aims to address this local knowledge gap. The research method included an initial conceptual framework of factors (identified from surveying both global and local literature) as a launch pad in order to quantitatively survey design consultants in Gauteng with regards to both the significance and ease of implementation of the identified factors. The research target population consisted of; architects, architectural technologists, architectural draughtsman, structural engineers, structural technologists, structural draughtsman and finally sustainability consultants. The target population was further narrowed by only including designers who have both attempted to minimise construction on greenfield projects in Gauteng and who have received Green Building Council of South Africa (GBCSA) accreditation on the same project. This report presents a hierarchical list of twenty-six critical factors that can be implemented during the design stage in order to minimise or avoid construction waste in the context of Gauteng, South Africa. The report further indicates which of these factors will be easier to implement than others. These factors are aimed mainly at clients of construction projects, as they are in essence the stakeholders who will contractually enforce designers to implement these construction waste minimisation factors in order to lower project costs. Furthermore; these factors will also serve as valuable references for the Gauteng Provincial Government as the factors can be utilized in order to drive provincial construction waste regulations and eventually national reform.en_ZA
dc.identifier.urihttp://hdl.handle.net/10539/17544
dc.language.isoenen_ZA
dc.subject.lcshWaste minimization
dc.subject.lcshConstruction industry--Materials management
dc.subject.lcshWaste minimization--South Africa--Gauteng
dc.titleCritical factors in effective construction waste minimisation at the design stage: a Gauteng region case studyen_ZA
dc.typeThesisen_ZA

Files

Original bundle

Now showing 1 - 2 of 2
No Thumbnail Available
Name:
0701162P_ANINE WORTMANN_MSC-CPM_ABSTRACT.pdf
Size:
107.55 KB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
0701162P_ANINE WORTMANN_MSC-CPM_REESEARCH REPORT.pdf
Size:
1.01 MB
Format:
Adobe Portable Document Format
Description:
Main article

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections