Quantifying the overburden material types at Grootegeluk Coal Mine
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
University of the Witwatersrand, Johannesburg
Abstract
Grootegeluk Coal Mine exploits approximately 58 Mtpa of run-of-mine through a bulk open cast mining method. According to the latest mine scheduling information, a yield of 50% is attained. Consequently, half of the ROM produced annually will be redirected to discard after beneficiation. For this reason, equal effort must be given to manage the waste material. The rehabilitation methodology implemented utilises a continuous feed of waste material to the backfill area for construction. The backfill operation is designed in terraces to accommodate for sealing of the spontaneous combustible discard material, and for practical design constraints for the extendable units. Currently, the only material types available that are deemed appropriate for the platforms’ construction are the interburden sandstone, and the competent shale material from the overburden. If the construction of these platforms were to cease due to a lack of available competent material for placement, the mine will struggle to find appropriate areas to stack large volumes of the plants’ discard. This may lead to a halt in production pending alternative solutions. The focus of this study is to quantify the overburden material types for the coal resource, utilising two different methodologies, namely a vertical distribution and quantification model of the overburden material types in the middle-pit, and an updated overburden classification map for the Grootegeluk coal resource area. The aim is not only to quantify the overburden material types for the medium to long-term period, but also to find practical solutions to allocate the correct overburden material types for backfill construction. The vertical distribution model (“project model”) depicts significant differences in competent shale tonnes when compared to the 2022_2D overburden classification within the middle-pit model boundary. This however is not an indication of loss in practical mineable tonnes since the project model includes the volumes of each lithological unit within the overburden, whilst 2022_2D model condensed the material types to three main categories. The project model indicates that competent shale can be identified within highly weathered areas where clay and weathered shale are predominant. The updated overburden resource classification map of 2023 delineated the areas within the life-of-mine where competent shale is intersected close to topographic surface. This information indicates a potential of unlocking 55 Mt of competent shale within the middle-pit that were previously classified and scheduled to be directed to the backfill terraces for sealing discard. These results from both of the models indicate that value can be unlocked by selectively loading competent shale material within highly weathered overburden. It requires short-term operational measures to be enforced and the need for competent shale loading to be synchronised within the mining schedule.
Description
A research report submitted in fulfillment of the requirements for the Master of Science, in the Faculty of Science, School of Geosciences, University of the Witwatersrand, Johannesburg, 2025
Keywords
Citation
Poley, Mietha Chubella. (2025). Quantifying the overburden material types at Grootegeluk Coal Mine [Master’s dissertation, University of the Witwatersrand, Johannesburg]. WIReDSpace. https://hdl.handle.net/10539/50289