A comparison of various modelling techniques to optimise production rate on a platinum mining project

dc.contributor.authorDreyer, Jaco
dc.date.accessioned2022-10-05T12:39:23Z
dc.date.available2022-10-05T12:39:23Z
dc.date.issued2021
dc.descriptionA research report submitted to the Faculty of Engineering and the Built Environment, University of the Witwatersrand, in partial fulfilment of the requirements for the degree of Masters of Science in Engineering, 2021en_ZA
dc.description.abstractEvery business aims to create an optimal economic value for its shareholders. The production rate is one of the critical drivers of value in the mining business. Several approaches have been developed to determine the production rate for mining operations. This study applied three approaches for determining production rate, namely the tonnage-based, microeconomic and marginal-analysis modelling methods. These methods were applied on a platinum project, and the production rate results from the three methods were used to determine the life of mine (LOM) production profiles, capital expenditure (CAPEX) and operational expenditure (OPEX). These results were then used as inputs into a discounted cash flow (DCF) model. The DCF model results were compared and analysed to determine a production rate determination method that results in an optimum production output rate for the project. The study revealed that the tonnage-based modelling technique resulted in the highest production rate of 410-kilo tonnes per month (ktpm), the highest CAPEX of USD957.24 million, the lowest OPEX of USD75.37 per mined tonne, the highest net present value (NPV) of USD63.12 million and the highest internal rate of return (IRR) of 12.85% over a 40-year LOM. The microeconomic modelling technique ranked second with a production rate of 270 ktpm, CAPEX of USD 726.24 million, OPEX of USD 76.68 per mined tonne, NPV of USD 3.46 million and IRR of 10.17%. The marginal-analysis modelling technique ranked last with a production rate of 230 ktpm, CAPEX of USD 658.76 million, OPEX of USD 77.83 per mined tonne, NPV of USD -10.69 million and the lowest IRR of 9.47%. Mineral Resource tonnage-based modelling may be further investigated in other commodities other than platinum or other multi-element/polymetallic mineral deposits in line with the South African mining industry. This will result in the formulation of industry-specific calibration in the South African mining industryen_ZA
dc.description.librarianCK2022en_ZA
dc.facultyFaculty of Engineering and the Built Environmenten_ZA
dc.identifier.urihttps://hdl.handle.net/10539/33392
dc.language.isoenen_ZA
dc.schoolSchool of Mining Engineeringen_ZA
dc.titleA comparison of various modelling techniques to optimise production rate on a platinum mining projecten_ZA
dc.typeDissertationen_ZA
Files
Original bundle
Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
Abstract page_Dreyer_JJ_2011640.pdf
Size:
189.05 KB
Format:
Adobe Portable Document Format
Description:
Loading...
Thumbnail Image
Name:
Research Report_Dreyer_JJ_2011640.pdf
Size:
2.77 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: