Simulation of product transportation in open pit mines

dc.contributor.authorAli, Syed Mohsin
dc.date.accessioned2016-03-17T08:54:35Z
dc.date.available2016-03-17T08:54:35Z
dc.date.issued2016-03-17
dc.descriptionA research report submitted to the Faculty of Engineering and Built Environment, University of Witwatersrand, Johannesburg, in partial fulfilment of the requirements for the degree of Masters of Science in Engineering Johannesburg, 2015en_ZA
dc.description.abstractOpen pit mines account for more than 60 percent of all surface mines, and haulage costs account for almost 60 percent of total operating costs for these mines. It necessitates maintaining an efficient haulage system where all fleet equipment performs effectively to achieve the mine’s objectives. Discrete event simulation supported by animation offers a powerful method for evaluating such systems. This research has developed a simulation software program using Visual Basic for Application (VBA), GPSS/H (General Purpose Simulation System), and PROOF 5 animation. Remaining within the defined assumptions and boundary conditions, the research combines the powers of three software languages to build a general-purpose, data-driven, and user-friendly simulation program. The research focuses on the study and simulation of some of the important complexities of the truck haulage system. These include uncertainty or system randomness, fleet heterogeneity, multi-loader multi-dump sites, bunching of haulers, and hauler dispatching. In the developed simulation program, the user is required to provide the inputs in the user-friendly environment of VBA. The simulation program arranges the inputs in a pre-arranged format and then sends them to GPSS/H. The simulation language generates a discrete event simulation model based on the receiving structural and operational data. After simulating the system, the model generates the simulation outputs and animation commands in separate files. VBA displays a summary of the simulation results, and PROOF 5 demonstrates the results in a 2-dimensional graphical animation along with detailed information. This research also includes three case studies based on hypothetical mines for the analysis of simulation results. It establishes comparisons between the dispatching policies of fixed allocation and variable allocation of Minimize Production Requirements (MPR), and shows that the MPR policy is more suitable to achieve the quality control objectives. The developed simulation program contributes by demonstrating the powers of simulation to analyse open pit haulage systems. It also shows how simulation can be utilized as a useful technique to answer many ‘what-if?’ questions and scenarios.en_ZA
dc.identifier.urihttp://hdl.handle.net/10539/20113
dc.language.isoenen_ZA
dc.titleSimulation of product transportation in open pit minesen_ZA
dc.typeThesisen_ZA

Files

Original bundle

Now showing 1 - 2 of 2
No Thumbnail Available
Name:
797945 SYED MOHSIN ALI – ABSTRACT.pdf
Size:
72.63 KB
Format:
Adobe Portable Document Format
Description:
No Thumbnail Available
Name:
797945 Syed Mohsin Ali - Research Report.pdf
Size:
1.26 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections