Study to evaluate the economic feasibility of replacing a pressure reducing valve with a pressure reducing turbine for a specific case study

dc.contributor.authorNadaraju, Francis Joseph
dc.date.accessioned2012-08-17T08:52:23Z
dc.date.available2012-08-17T08:52:23Z
dc.date.issued2012-08-17
dc.description.abstractThe technical and economic feasibility of energy recovery, using of a reverserunning pump, has been carried out. Water flow and pressure data for an underground pressure-reducing station, at Anglogold Ashanti Mponeng mine, was used. A statistical analysis resulted in a design flow and pressure. Turbine curves for a HPH 28-1S pump were provided by Sulzer and regression models were used to predict system performance. Variable and constant speed systems were proposed. The expected energy recovered would be 318.5 kW and 319.1 kW for the variable and constant speed systems, respectively. The discharge water temperature for both systems would be 10.32 °C. The constant speed system was preferred since the capital cost (R 3 776 900) and payback period was lower (2.3 years), while the NPV (R 11 645 000) and IRR (42.9 %) was higher. The system should be constructed to confirm the design calculations and predicted results.en_ZA
dc.identifier.urihttp://hdl.handle.net/10539/11767
dc.language.isoenen_ZA
dc.titleStudy to evaluate the economic feasibility of replacing a pressure reducing valve with a pressure reducing turbine for a specific case studyen_ZA
dc.typeThesisen_ZA
Files
Original bundle
Now showing 1 - 2 of 2
No Thumbnail Available
Name:
MSc Abstract FJN Nov2011.pdf
Size:
5.25 KB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
MSc Research Report FJN Nov2011.pdf
Size:
2.22 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description:
Collections