Faculty of Engineering and Built Environment

Permanent URI for this communityhttps://wiredspace.wits.ac.za/handle/10539/5024

For information on accessing Architecture & Built Environment content please contact Katlego Chiya via email : Katlego.Chiya@wits.ac.za or Tel (W) : 011 717 1978

For information on Engineering collections content please contact Salome Potgieter by email : salome.potgieter@wits.ac.za or Tel : 011 717 1961

Browse

Search Results

Now showing 1 - 3 of 3
  • Thumbnail Image
    Item
    Modeling the cooling of concrete by piped water.
    (American Society of Civil Engineers., 2009) Myers, T.G.; Fowkes, N.D.; Ballim, Y.
    Piped water is used to remove hydration heat from concrete blocks during construction. In this paper we develop an approximate model for this process. The problem reduces to solving a one-dimensional heat equation in the concrete, coupled with a first order differential equation for the water temperature. Numerical results are presented and the effect of varying model parameters shown. An analytical solution is also provided for a steady-state constant heat generation model. This helps highlight the dependence on certain parameters and can therefore provide an aid in the design of cooling systems.
  • Thumbnail Image
    Item
    Modelling the cooling of concreate by piped water
    (2009-03-25) Myers, T.G.; Fowkes, N.D.; Ballim, Y.
    Piped water is used to remove hydration heat from concrete blocks during construction. In this paper we develop an approximate model for this process. The problem reduces to solving a one-dimensional heat equation in the concrete, coupled with a first order differential equation for the water temperature. Numerical results are presented and the effect of varying model parameters shown. An analytical solution is also provided for a steady-state constant heat generation model. This helps highlight the dependence on certain parameters and can therefore provide an aid in the design of cooling systems.
  • Thumbnail Image
    Item
    Modelling the cooling of concrete by piped water
    (2009-03-25) Myers, T.G.; Fowkes, N.D.; Ballim, Y.
    The chemical reaction can lead to temperature rises in excess of 50 K and it can take a number of years before the concrete cools to the ambient temperature. Prior to construction of the Hoover dam engineers at the U.S. Bureau of Reclamation estimated that if the dam were built in a single continuous pour the concrete would require 125 years to cool to the ambient temperature and that the resulting stresses would have caused the dam to crack and fail (U.S. Bureau of Reclamation 2005).