Study to evaluate the economic feasibility of replacing a pressure reducing valve with a pressure reducing turbine for a specific case study

DSpace/Manakin Repository

Show simple item record

dc.contributor.author Nadaraju, Francis Joseph
dc.date.accessioned 2012-08-17T08:52:23Z
dc.date.available 2012-08-17T08:52:23Z
dc.date.issued 2012-08-17
dc.identifier.uri http://hdl.handle.net/10539/11767
dc.description.abstract The technical and economic feasibility of energy recovery, using of a reverserunning pump, has been carried out. Water flow and pressure data for an underground pressure-reducing station, at Anglogold Ashanti Mponeng mine, was used. A statistical analysis resulted in a design flow and pressure. Turbine curves for a HPH 28-1S pump were provided by Sulzer and regression models were used to predict system performance. Variable and constant speed systems were proposed. The expected energy recovered would be 318.5 kW and 319.1 kW for the variable and constant speed systems, respectively. The discharge water temperature for both systems would be 10.32 °C. The constant speed system was preferred since the capital cost (R 3 776 900) and payback period was lower (2.3 years), while the NPV (R 11 645 000) and IRR (42.9 %) was higher. The system should be constructed to confirm the design calculations and predicted results. en_ZA
dc.language.iso en en_ZA
dc.title Study to evaluate the economic feasibility of replacing a pressure reducing valve with a pressure reducing turbine for a specific case study en_ZA
dc.type Thesis en_ZA


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search WIReDSpace


Advanced Search

Browse

My Account

Statistics